Open Aperture F1 / M01
Receiving and fit check
Start with the stage in your hands. Identify the part and drawing revision, measure the mounting pattern, then record the datum and units so the drawing reviewer can decide whether the base can be drilled.
Which F1 files go to the shop?
The six STEP files directly under hardware/ are in millimetres. The issued shop sheets govern machining dimensions. The context assembly is an additional file.
Two cassette assemblies. Each has four wall bars.
A1_SQ_cassette.step · A1_RECT_cassette.stepThree states of one physical holder. Count one holder and three interchangeable blades.
A2_SQ_reference.step · A2_RECT_reference.step · A2_DARK_reference.stepOne installed fixture. Use the shop sheets for dimensions and quantities.
A3_installed_fixture.stepSeparate 13-solid reference assembly. Its undrilled base locates the square cassette and fixture.
context/M01_square_installed_context.step
On 13 November 2026, the studio reported that parts had been ordered or contracted and deliveries had begun. Each line on this sheet starts blank. Record receipt when someone has the actual item.
Item record
Entries stay on this device. Save here, export a private copy or print the sheet for the shop.
Take the handoff with you
Export includes every locally saved item. Import reads a sheet export on this device and adds its records. Conflicting versions stay separate. Print includes the currently displayed item.